Factory Price 700a/700 Ampere 3 Pole 4p Terminal Automatic Transfer Mains Changeover Switch Ats System for 2000kva Generator.
Rated Frequency :
50hz/60hzRated Voltage :
400VMaterial :
Copper, Iron, DMCFrame current :
700AModel Number :
SKT1-700A/4PATS

Key Features& Benefits
Zero Downtime: Seamless switch within seconds of power failure.
Safety First: Prevents dangerous backfeed to utility grid (UL/IEC compliant).
Generator Control: Sends automatic start/stop signals to your genset.
Durable: Built for high-load industrial environments.
Flexible Modes: Auto, Manual, Test, Off.
Easy Monitoring: Clear controller display & remote options (Modbus/SNMP).
Key attributes
| Type | PC |
| Number of Pole | 4 |
| Model Number |
SKT1-700A/4P |
| Rated Current | 700A |
| Place of Origin | Fujian, China |
| Application | households |
| Phase | Single Phase, Three Phase |
| Frame current | 700A |
| Model | High Quatity |
| Rated frequency | 50hz/60hz |
| Rated voltage | 400V |
| Color | Optional |
| keywords | 700a automatic transfer switch |
| Packing |
Plywood Packing or Plastic Packing |
| Material |
Copper, Iron, DMC |
| Max current |
3600a |
| Packaging and delivery | |
| Selling Units | Single item |
| Single package size | 16X10.5X4.5 cm |
| Single gross weight | 68.000 KG |
Product Display

Product Details

Application
Critical Infrastructure: Hospitals, data centers, telecom sites, water treatment plants, and emergency services.
Industrial & Commercial: Manufacturing plants, oil & gas facilities, office buildings, hotels, and retail centers.
Remote & Essential Sites: Construction projects, cell towers, and facilities requiring reliable backup power anywhere on the globe.

Q&A
Q1: What is your MOQ of this item?
A: 1 pcs
Q2: What is the lead time?
A:2days after receiving your L/C or TT deposit.But if your order is some special engine and alternator, then the delivery time is longer.
Q3: Is it able to make customer's own brand name?
A: We can be your OEM manufacture with your authorization of brand.
Q4: Where is your Loading Port?
A: Any port in China. Usually Fuzhou port.
Q5: What is your payment term?
A: We can accept T/T 30% in advance, and the balance 70% shall be paid before shipment or L/C at sight, L/C deferred payment terms or west union.
Q6: What is your company's available production capacity?
A:1000 000000
For More details,can send us inqury to know Factory Pirce!